Thursday, October 31, 2024
HomeNewsTechnologyABB E-mobility and Lilium N.V. are scheduled for commercial launch in 2024

ABB E-mobility and Lilium N.V. are scheduled for commercial launch in 2024

follow us on Google News

ABB E-mobility and Lilium N.V. have announced plans for ABB to provide the charging infrastructure for Lilium’s high speed regional air network, scheduled for commercial launch in 2024.

Lilium Vertiport and Lilium Jet Render
Lilium Vertiport and Lilium Jet Render

Lilium has announced planned launch networks in Florida, Germany, and Brazil. As part of the agreement, ABB will develop, test and supply the MegaWatt fast charging infrastructure necessary for the quick turnaround times needed for electric aviation. The ABB charging points are designed to be capable of fully charging batteries in approximately 30 minutes, and charging up to 80% in 15 minutes, enabling the 20-25 flights per aircraft per day planned across Lilium’s global vertiport network. The initial range of a 7-Seater Lilium Jet is expected to be 155 miles with a cruise speed of 175mph.  

Lilium Physical Model
Lilium Physical Model

The regional air network will be made up of a series of vertiports, which will have multiple parking bays and high-power charging points. The MegaWatt Charging System (MCS), the infrastructure to be developed under this planned partnership, will allow direct current (DC) charging of up to 1000 kW and can also be used for electric heavy-duty vehicles, such as trucks and buses. In the development of the MCS, ABB and Lilium plan to adhere to the relevant standards that support interoperability.


Discover more from SNAP TASTE

Subscribe to get the latest posts sent to your email.

Leave a Reply

FEATURED

RELATED NEWS

Discover more from SNAP TASTE

Subscribe now to keep reading and get access to the full archive.

Continue reading